Build log date: Wednesday, April 07, 2004
-
Drilled the steps to the fuse, big pain repeatedly fitting removing, bending, fitting.

-
Because the access under the floor sucks, I used a 12" drill bit to drill the step to the bearing block.

-
Expand step holes to final size once removing from fuse.

-
Now that the blocks have been match drilled to the god damned baggage bulkheads, expand to #10 cause plastic will shrink back to #12.

Previous Top Next