Build log date: Tuesday, April 06, 2004
-
Ugh - thus begins the hell that is the steps. Spent many days on something that would have been a couple of evenings if I had done this before installing the baggage floor. When Van's says that the steps are 'optional' they lie.

-
Marking rivet holes in the steps prior to drilling #40 pilots.

-
Done drilling.

-
The other step also.

-
Drill #30 pilot holes in the center step bearing blocks, drill to final size in assembly.

-
Both blocks now drilled.

Previous Top Next