Build log date: Friday, April 09, 2004
-
The steps now go in the 'to prime' pile.

-
This is me trying to be arty as I photograph drilling these C-668 roll bar spacers.

-
Start at #40 down in the garage, then expand to #30, #19, #12 and for the aft spacers 1/4" inch.

-
The spacers look great. Nicely deburred.

-
Marking the rollbar to avoid confusion when I drill out these holes to full size. The aft holes go to 1/4"

-
Rollbar holes drilled.

Previous Top Next