Build log date: Saturday, January 03, 2004
-
More pretty pictures.

-
I made this cool aluminum drill block to hold the two arms perpendicular and drilled the two arms.

-
The aft spar is drilled - I used a 3/16 bit as a spacer.

-
Now that the elevators are temporarily installed I can install the elevator pushrod and set the exact length, per plans.

-
I've drilled the back of the stab.

-
I used a 12 inch #30 drill bit to help ensure that the hole is perfectly perpendicular.

Previous Top Next