Build log date: Friday, January 02, 2004
-
To make room for the fuse I needed to ditch some old shelves from the garage.

-
Uh - this is where the roof that our house builders installed leaked. Dumped a bunch of water on my instruments, fortunately everything was sealed in bags.

-
The static tubing is now installed - this was a royal pain in the ass. Needed to use hot water to expand the tubes for the T fitting.

-
The four rivets in the middle were only installed as pop rivets by the QB guys for some reason. I drilled out the pop rivets and installed the rivets in the plans.

-
The horizontal stabilizer is now installed. Pretty F'n cool.

-
The rear snowboard support is now bolted in place, as are the seatbelt cables.

Previous Top Next