Build log date: Tuesday, November 25, 2003
-
Match drilling the aft bulkhead to the fuse.

-
Today is priming day - look at this mountain of stuff I've fabricated and been waiting to prime.

-
The aft bulkhead is now riveted together, the aft side must be flat so that the vertical stab can be attached.

-
Now I'm attaching the side nutplates to F-766A.

-
Install the top left handed nutplates on F-766A.

-
More nutplates - installing F-983C.

-
The rudder stops are ready to install after the tail is on.

-
This is cool - now the electric aileron trim is fully assembled.

Previous Top Next