Build log date: Monday, November 24, 2003
-
I've replaced the incorrect rivets - notice the countersunk pop rivet.

-
The landing gear is now drilled to match the fuse.

-
Wow - look at this pile of tools. This is an example of how a little thing like drilling and mounting gear can equate to a lot of work. I needed all of these tools to perform this task.

-
This is an example of 'making lemonade cause you have lemons' - I needed to install a shim for the area my helper messed up. By using a bit of alclad I can ensure a good ground plane connection for the ELT antenna.

-
Drilling and installing the side nutplates on F-785A.

-
Match drilling the F-7109 stiffener to the center forward rib.

-
Cutting a bit of clearance for the center rudder peddal support.

-
Match drilling my replacement aft bulkheads.

Previous Top Next