Build log date: Wednesday, November 26, 2003
-
The seat back supports are now riveted in place.
-
The central control weldament is installed - at least temporarily. At each bearing I needed two -10 and one -10L washers.
-
Drilled a hole for control stick wiring - per max size specified by Van's.
Previous Top Next