Build log date: Saturday, November 08, 2003
-
Match drilled holes for the aft bulkhead.
-
Done drilling the Altrack bracket to the floor. I need to dimple the skin and prime the bracket before riveting.
-
Match drilled the F-824B covers and accidentally screwed up the aft bulkheads. This is the second part I'll need to replace in this project (the first was the elevator trim tab cover). My mistake was the QB bulkhead had shifted on the bottom before I match drilled, and I didn't realize the bottom of the bulkhead was already prepunched. I drilled holes that overlapped with the bottom bulkhead holes.
-
Max came over and fabricated these rudder stops. Later on I finished them up.
-
A bunch of misc brackets fabricated per plans.
Previous Top Next