Build log date: Friday, November 07, 2003
-
Finish drilling the second seat.

-
Drilling the seat braces to their hinges.

-
Two complete seats with braces, ready to rivet. I'm going to wait until I have the floors in before riveting these seats, Dan Checkoway mentioned that the plans hinge location left inadequate clearance. I think I'm okay, but I want to check before riveting.

-
I got this strobe on eBay, just checking to make sure it works. It is a 28V model, so I was expecting to need a DC-DC converter, however 14V looks to work fine. I'm going to take it to a lab at work so I can compare 28V with 14V.

Previous Top Next