Build log date: Friday, May 13, 2005
-
Tap the longerons for the emp gap seal (also a bit of countersinking for #6 screws).

-
Measured and fabricated these steel rudder cable links (2 3/8" hole to hole). Once dry I can permanently attach the rudder peddals. I initially tried a few different lengths by using scrap aluminum, but this seems to fit a range of pilot sizes.

-
Cutting the fuel lines to the _incorrect_ length. I calculated 3 1/4" but somehow cut _both_ fuel lines to 2 1/4". dumbass. I'll need to spend threeish hours replacing the tubes.

Previous Top Next