Build log date: Friday, April 23, 2004
-
Fabricating a bracket for extra support on the transponder.

-
Panel pieces back in.

-
Match drilled the transponder support bracket.

-
Installed the overvoltage protection contactor.

-
Installed the alternator fuseable link bracket.

-
Switch subpanel installed for wiring.

-
Other side of the panel.

-
Working on anything I can to avoid the damn slider bending. Here are the snap bushings for the control cables.

-
Engine controls installed. Not sure how to fabricate the support bracket.

-
Firewall side of the control cables.

-
Control cables down near the peddals.

Previous Top Next