Build log date: Thursday, April 22, 2004
-
Sorting through left over parts from the steps, so I can put them in the correct bins.
-
About to drill a hole for the Altrak switch.
-
The dynon EMI errata says to be sure there is good ground contact on each of the four mounting screws. So I've removed the primer on the back of each of the Dynon holes.
-
Installing nuts on the VSI, I'm installing a bunch of the steam gauges now.
-
Pretty - gauges are in. Waiting for the wing leveller and engine instruments. My custom avionics will go in the lower left hole.
Previous Top Next