Build log date: Wednesday, December 31, 2003
-
The left gear is now bolted in place.

-
Installed the brake fluid resovour.

-
A bit of high temp RTV to prevent CO leaking in from the firewall.

-
Installed the elevator bellcrank. I noticed that my autopilot servo had been damaged in shipment, sent it back to Trutrak - they did a great job of sending back a new servo without even waiting for my damaged servo to arrive.

-
Installed the polyflow fitting onto the brake resovour.

-
Installed nutplates (per plans) for the oil pressure hose.

Previous Top Next