Build log date: Monday, December 15, 2003
-
This morning before work I temporarily installed the battery box.

-
I finally cut the schedule 125 tubing that my tech advisor recommended for wing conduit.

-
After fitting the 'snowboard rack' angle, I marked approximate rivet locations as a prelude to match drilling.

Previous Top Next