Build log date: Saturday, November 01, 2003
-
The vent openings are fabricated.

-
Did a bit of riveting.

-
Drilled the landing gear to the bracket per plans. Had to borrow the neighbor's 3/8" chuck drill.

-
Installed and match drilled the brake flanges.

-
Drilled the first hole in the flap brackets. The other hole is match drilled in the fuse.

-
Placed a bit of aluminum screen on the vent openings with some JB weld. Per plans.

-
Drilling lightening holes in the seat back braces.

-
Deburring the braces.

Previous Top Next