Build log date: Tuesday, September 30, 2003
-
I went ahead and fabricated the left fuel tank sender/float.

-
Becky is using the scotchbright wheel to carefully shape the landing light hole. Nice reflection.

-
Folloing the Duckworks directions - I've installed nutplates into the right wing and now I'm fabricating both the left and right landing light brackets.

Previous Top Next