Build log date: Tuesday, May 10, 2005
-
Removing the wheels so I can take off the fairing mounts till post phase 1.

-
Wheel cruft.

-
Had to remove this cotter pin.

-
Brake calipers safetied.

-
The other emp seal.

-
Trimmed and drilled the emp gap seal.

Previous Top Next