Build log date: Sunday, March 27, 2005
-
Per the Sika instructions - use scotchbrite pad to rough up the area prior to the 209 Sika primer.

-
Done with the scotchbrite.

-
First I apply the Sika cleaner/prep.

-
Now the Sika Primer 209N goes on the canopy.

-
Pretty - this primer is black. I used about a 1" area for each line of primer, if I was doing it again I would do 1.5"

-
Now I prep the canopy frame with the 226 cleaner.

-
Rus came over to help with the big 'glue the canopy to the frame day' - thanks Rus!

-
More Rus goofiness.

-
A rare opportunity to have a picture with me in it - someone else to hold the camera.

-
Looks good.

-
I should have masked off the sides of the bars, but this is going to get covered anyway.

-
A horrible photo of myself.

-
Touching up more canopy Sika.

Previous Top Next