Build log date: Thursday, January 13, 2005
-
The DB connector for the right panel power.

-
I forget what this connector was...

-
Attach carb heat cable to a bulkhead to prevent vibration.

-
Tie prop cable to the rudder bulkhead to prevent vibration.

-
Wire the few remaining EIS runs, the P lead pickup goes through a resistor to the left mag switch.

-
Install an adel clamp for the left sub panel wiring run.

Previous Top Next