Build log date: Monday, December 27, 2004
-
Torque the fuel line - later I had to loosen it one more time, to get access for installing the SCAT tubing to the hot air vent.

-
Torque prop control cable.

-
Oil filler neck installed and safetied.

-
Drilling aft baffle seals.

-
Install the fuel diaphram failure vent.

Previous Top Next