Build log date: Saturday, November 06, 2004
-
Fabricate a GPS antenna bracket and match drill to the firewall.

-
The baffle hole for the prop oil line is nicely drilled.

-
Match drill one of the left baffle floor brackets.

-
Finished the GPS bracket.

-
Match drilled the left floor to the spinner baffle.

-
Rivetted the oil cooler/baffle corner.

Previous Top Next