Build log date: Sunday, October 17, 2004
-
Match drilling the oil cooler bracket to the baffle.

-
Match drilling the two left baffles together.

-
Some of the rivets sit below the cooling fins - so they must be countersunk. Unfortunately not enough room for the microstop cage so I did it by hand.

-
Oil cooler opening is rough cut.

Previous Top Next