Build log date: Monday, September 06, 2004
-
Match drill the camlock supports.

-
Dimple the firewall flange.

-
More camlock match drilling.

-
A zillion clecos to put in the forward top panel without messing up any holes.

-
Done drilling the right camlock panel.

-
Drilling the top camlock panel.

-
More camlock drilling

-
I'll try to make this gap even while fitting cowl.

-
More cowl fitting.

-
Drill/countersink/dimple the camlock panel/spacers.

-
Countersinking the camlock panels.

Previous Top Next