Build log date: Wednesday, September 01, 2004
-
Rough cut the cowl oil door.

-
Marking the initial cut lines on the oil door.

-
Fabbed the oil door hinge - test fitting for the cut.

-
The oil door is now sanded to size.

-
Test fit of the oil door hinge - spacers will be needed.

-
The hinge is drilled to the cowl, about to drill to the door.

-
A scary picture of me to keep the FAA happy. Notice the spacers on the oil door.

-
Begin cutting the hartwell latches in the oil door.

-
The latches are mostly done - a little bit more trimming.

-
Making the initial cut in the cowl for the nose gear leg.

-
The bottom cowl can now slide on far enough to mark trim lines

Previous Top Next