Build log date: Wednesday, August 18, 2004
-
Using a bit of plastic tube as a drill spacer for the #42 bit when drilling the fiberglass.

-
Pretty - the fairing is now drilled to the hinges.

-
Photo from above.

-
Riveting the hinges to the fairings (after upping the sizes to #40).

-
Cutting the slots so the fairing can get clamped to the gear leg.

-
Bent and installed the hinge pins.

-
The fairings are virtually done.

-
Using a copycat tool to get an initial idea of the cutout needed on the spinner.

Previous Top Next