Build log date: Thursday, August 12, 2004
-
Cabin heat muff temporarily installed - to check clearances.

-
Throttle cable pushrod attached to carb and torqued.

-
Temporarily install the lightspeed coils.

-
Installed the heat shield that protects the fuel line from the exhaust stack.

-
Per plans - put a joggle into the alternator bracket.

-
Rivetted the spinner bracket together.

Previous Top Next