Build log date: Tuesday, August 10, 2004
-
Alumiprep a few misc pieces for priming.
-
Putting the filter back on (with some DC-7)
-
Finally bolt the the governor to 95 inch/lbs - now that the bracket can go on.
-
Install the carb control bracket on the sump - a bit of dremel action was needed expand the bracket holes to match the studs. I put the usual DC-7 on the gaskets.
Previous Top Next