Build log date: Sunday, August 08, 2004
-
Finish up the forward static tubing.

-
Install static run to the altitude encoder.

-
Install the DB25 connector for the 'kevin' avionics box.

-
I've decided to change from my surplus Whelen power supply to a more modern automotive strobe unit - but I need to make a short adapter cable.

-
Getting ready to hang the engine - lube up the lord mounts with DC 7. Oh yeah.

-
Move the engine into position for when people come over to help hang it.

Previous Top Next