Build log date: Saturday, May 15, 2004
-
Garage cleaning day.

-
A small sample of the crap I've created.

-
Fuse turned around for better firewall access.

-
Installing belly antenna with a bit of dilectric grease.

-
Torque the main gear to the gear mount.

-
Pretty - Belly antenna in.

-
Installing the cabin heat valve - with a bit of high temp RTV.

-
Torque the engine controls to the panel.

-
Cabin heat valve mounted to firewall.

-
Drilling holes for the parking brake cable bracket.

-
Cutting parking brake cable to length.

Previous Top Next