Build log date: Monday, April 12, 2004
-
I needed to reuse these nutplates that I drilled out for the step installation.

-
Using a dremel I expanded a hole for the moved conduit. Now that the steps are in I need to route the conduit differently.

-
Yay, the right baggage floor is back in.

-
The left floor baggage floor is in also.

-
Pretty - a lot of pop rivets.

Previous Top Next