Build log date: Sunday, March 21, 2004
-
Install the radio panel supports and match drill them to the frame.

-
Install fuel and oil pressure lines.

-
Now that the tail is off, I can rivet the aft two rivets for the longeron.

-
Also rivet four places that were not preriveted in the QB kit.

-
More tedium making patterns for the soundproofing panels - almost done with this crap.

Previous Top Next