Build log date: Tuesday, January 06, 2004
-
Now the front VS bracket can be drilled to full size and removed.

-
The top four rivet holes needed to be drilled off of the plane.

-
The plans call for adding two rivets to the bottom hinge bracket, so I drilled and countersunk these holes. Later I riveted these two rivets.

-
Pretty - However, the middle bearing needs to be adjusted slightly.

Previous Top Next