Build log date: Friday, November 14, 2003
-
Riveting the nutplates on the forward baggage covers.

-
Match drilling the baggage floors.

-
Match drilled the F-724(?) covers.

-
I don't remember what is going on in this picture.

-
Drilling holes for conduit under the floor of the baggage compartment. Eventually I'll be routing static line, strobe wires and ELT control wire.

-
I considering using these tubes for my wing conduit, however they are crap - too inflexible.

-
Begin drilling the main landing gear holes.

-
This could be bad. Both of the bottom firewall weldaments are cracked between the four bolts and the five rivets. I suspect the QB folks broke this weld on purpose to make it fit the angle of the bottom longeron. This picture shows the right weldament. Update: Van's says that seam is not intended to be welded - it is just cracked power coat - all is well.

-
This picture shows the other bottom weldamnt, on the left of the firewall.

-
An accidental extra picture.

-
One more picture.