Build log date: Friday, November 14, 2003
-
Riveting the nutplates on the forward baggage covers.
-
Match drilling the baggage floors.
-
Match drilled the F-724(?) covers.
-
I don't remember what is going on in this picture.
-
Drilling holes for conduit under the floor of the baggage compartment. Eventually I'll be routing static line, strobe wires and ELT control wire.
-
I considering using these tubes for my wing conduit, however they are crap - too inflexible.
-
Begin drilling the main landing gear holes.
-
This could be bad. Both of the bottom firewall weldaments are cracked between the four bolts and the five rivets. I suspect the QB folks broke this weld on purpose to make it fit the angle of the bottom longeron. This picture shows the right weldament. Update: Van's says that seam is not intended to be welded - it is just cracked power coat - all is well.
-
This picture shows the other bottom weldamnt, on the left of the firewall.
-
An accidental extra picture.
-
One more picture.
Previous Top Next