Build log date: Sunday, October 05, 2003
-
Today was priming day - I try to do priming in big batches. Did the light fixtures, some misc. small parts, flap reinforcements, pushrods, and spotty - our cat. ;-)

-
I've now riveted the nutplates into the light fixtures.

-
I riveted on the flap reinforcement and hinge for the right wing.

-
The right wing reinforcement being pop riveted to the aft bracket.

Previous Top Next