Build log date: Monday, July 28, 2003
-
This is just a picture of the careful flap/aileron wrapping by Van's.

-
Begin work on the dreaded trim tab. Here I'm match drilling the brackets that attach to the trim servo.

-
Match drill the trimtab hinge, spar and the upper elevator trimtab. Doing this now will allow me to back-rivet the bottom rivets later (a good idea from the mailing list).

Previous Top Next