Build log date: Thursday, June 26, 2003
-
The HS 405 to spar holes need to be drilled based on dimensions in the plans.

-
The inboard rib is not fully prepunched, it must be lined by using a sharpie line and the holes in the skin.

-
The right skin goes on for match drilling.

-
The right side gets drilled ver much like the left.

-
The right side of the HS now gets drilled. I forgot to take pictures/record time for all the rib fluting and straightening - so I'll make a note here.

-
Taa daa! The right side has now been driled.

-
The left HS has now been drilled.

-
I match drill the left elevator skin to skeleton.

-
This is beck disassembling the match drilled left HS.

Previous Top Next