Build log date: Monday, June 23, 2003
-
Before priming I use a scotchbright pad and alumiprep to prepare the surface of the aluminum parts.

-
Now the HS parts are primed.

-
Match drilling the HS fore spar.

-
Now that things are all primed the HS411 bearing can be assembled.

-
Done drilling.

-
The bearing is now match drilled to the spar with the AN3 bolts.

-
A shipment from Avery arrived, so I can use my pnuematic squeezer.

-
I needed to make a jig to measure the 7 degree bend I need to make in HS710/714.

-
Bending HS710/714 per plans.

-
I drilled the holes at the end of the bendline slightly outboard of the specified location. I sent email to Van's and they say it is fine.

-
A close-up photo of my mistake.

-
HS404 needs to be trimmed to clear HS710/714.

-
The VS spar reinforcement and brackets are match drilled to the spar.

-
The ribs are match drilled to the VS spars.

Previous Top Next